Our Current & Recent Projects

Alba Thermal Springs & Spa – Rockwater Pty Ltd – Fingal, Victoria

  • Project Overview:

    • Two 550m True Vertical Depth directionally drilled geothermal wellbores that successfully achieved 200m horizontal separation, to allow for the management of thermal breakthrough between production and injection zones
  • Work Scope:

    • Wellbore design and technical operational support

Cliff Head A – Triangle Energy Ltd – Perth Basin, Dongara 2020

  • Project Overview:

    • Grouting the conductor jacket legs of Cliff Head Alpha offshore production platform for the purposes of conductor remediation compliant with relevant industry Standards and Well Integrity laws
  • Work Scope:

    • Project Management and Drilling Engineering support for Titan Well Engineering (Primary Contractor)

Ground Water Replenishment Scheme (GWRS) – Water Corporation of Western Australia – Perth Region 2018-2019

  • Project Overview:

    • 9 x Leederville Bores average 320 metres
      • 30” (762 mm) Steel casing
      • 14” (DN350) Fiberglass GRE /w NOV FGS Nylon-lock
      • 7” (DN155) screens /w glass proppant
    • 6 X Yarragadee Bores average 1150 metres
      • 30” (762 mm) Steel casing
      • 20” (DN500) Fiberglass GRE /w NOV FGS Nylon-lock
      • 14” (DN350) Fiberglass GRE /w NOV FGS Nylon-lock
      • 7” (DN155) screens /w glass proppant
    • 1 x Superficial Bore
    • Over 10km of drilling/construction of Large Diameter Deep Water Recharge, Abstraction Bores and Monitor Wells with post drilling Well Development and Pump Test Operations
    • Drilling Rig: Schramm T130XD
  • Work Scope:

    • Preparation of Well Acceptance Criteria, Drilling Programs, End Of Well Reports (EOWR) and Management of Change (MOC) documentation
    • Qualification and verification of well barrier and P&A compliant with relevant industry standards and Well Abandonment Guidelines (eg, Minimum Construction Guidelines for Water Bores in Australia)
    • Conducting After-Action Reviews (AARs), documenting lessons learnt and ensuring such lessons are implemented in the next projects
    • Calculating and analysing drilling data and drilling improvement solutions and implementing any required changes

PEL 218 Abandonment Campaign – Beach Energy Pty Ltd – PEL218, South Australia

  • Project Overview:

    • 13 x Well Abandonment and well intervention programs designed for wells that required to be decommissioned
    • Abandonment work range: 2400 – 3300m
    • Well TD: 3500 – 4208m
    • Production casing size: ~5-1/2 x 5”
    • CO2 and H2S observed during well test
    • Temperature: 160 – 223 degC

Cadia East Dewatering Directional Boreholes – Newmont Corporation – Orange, New South Wales

  • Project Overview:

    • Drill and case 2 x vertical ranging holes to serve as marker points for first rising main bore
    • Drill and case 2 x directional bores while remaining outside the collapse region of the mine and ranging on to target TD wellbore position
      • Well landed 1500mMD/1130mTVD @78deg inclination within 0.3m of target
      • 14” , 9-5/8” and 7” casing utilized
      • Cement production casing through packer, up the annulus after mine breakthrough and void open hole of drilling fluid

Other Well Engineering, Project management and Operations Support Services

  • Tahmoor Coaking Coal Mine (Tahmoor Coal Pty Ltd)
    • 2 wells x 400m MD/TVD 20” and 10” (DN250) casing installed by drilling and hole opening
  • Appin Mine Ventilation Shafts (South 32)
    • 3 wells x 560m MD/TVD 20”, 16” and 12-3/4” casing installed by drilling and hole opening
  • Other ongoing